Obstruction & Delay Tracking Built for Litigation.
MXI’s obstruction tracking system captures every field impediment the moment it occurs — timestamped, geo-tagged, categorized, and structured for use in delay claims, disruption analysis, and litigation.
Why Standard Daily Reports Are Not Enough
Contractor daily reports are written by parties with a financial interest in the narrative. MXI’s obstruction system is built and maintained by an independent third party — capturing what actually happened, not what was convenient to report.

Comprehensive Capture of Every Field Impediment
Every scope release gap, congested access point, late submittal, design conflict, or resource hold is captured at the moment it occurs — with cause, affected trade, impacted activity, and estimated duration impact.

Structured for Legal Use From the Start
Each obstruction record is formatted to meet the evidentiary standards required for arbitration and litigation. Cause, responsible party, affected activities, and duration impact are recorded uniformly across every event.

Visual Mapping and Floor Plan Integration
Obstruction events are mapped to floor plans and area boundaries — enabling visual identification of congestion zones, access denial patterns, and multi-trade impact clusters ready for use as claim exhibits.

From Field Capture to Forensic Record
MXI’s obstruction data integrates directly with P6 schedules, RFI logs, and the project’s submittal register — creating a complete, cross-referenced evidentiary record that connects field events to contractual obligations.
Every Delay Becomes a Documented Fact.
With MXI’s obstruction tracking, every interruption becomes a documented, timestamped, legally defensible record — ready for integration into delay claims, disruption analyses, and litigation packages without reconstruction.

Integrated with Your Entire Project Record
Obstruction logs are linked to field photos, RFI references, submittal timelines, and schedule activities — creating a unified evidentiary package that tells the complete story of project impact.
Structured categorization of field delays by cause, responsible party, and trade
Direct integration with P6 schedule activities and critical path analysis
Real-time visualization of obstruction density and delay impact by area and trade

Why MXI Obstruction Tracking Works
Purpose-built for independent, legally defensible delay documentation.

Evidentiary Integrity
Records are maintained from the moment of occurrence — no reconstruction, no inference. Every obstruction event is traceable to a specific date, time, location, and responsible party.

Independent Documentation
All obstruction records are created and maintained by MXI — a party with no contractual relationship to any contractor, ensuring the documentation cannot be challenged as self-serving.

Claim-Ready Output
Every obstruction log is exportable in formats compatible with delay claim packages, arbitration exhibits, and legal discovery — no reformatting or reconstruction required.
